Senior Electrical Engineer
Ce portail protège votre vie privée en adhérant au Règlement général sur la protection des données (RGPD) de l'Union européenne. Nous n'utiliserons pas vos données à des fins auxquelles vous n'avez pas consenti. Nous demandons l'utilisation de données anonymes pour améliorer votre expérience sur notre site.
MSc degree in Electrical Engineering. PhD degree is a plus.
A minimum of 10 years’ experience in Electrical Engineering and Project Management.
Previous experience in R&D and with ANP R&D regulations is a plus.
Managerial skills to coordinate projects with Accredited Institutions and Brazilian Companies.
Excellent technical analysis, interpersonal, oral, and written communication, organization, and presentation skills.
Portuguese and English language skills are mandatory/to be acquired. French is a plus.
HSE & Quality: Ensure TotalEnergies EP Brazil compliance to the legislative and internal requirements relating to HSE and that all R&D activities conducted in Brazil are carried out with fully acceptable level of HSE. The employee shall perform his/her activities in compliance with the HSE Management System, aligned with One Maestro Principles and oriented to safeguard the integrity of people, the environment and Company’s assets and reputation.
Effective and strong interaction with RD Power headquarters in France.
Technical, budget and planning’s follow up of the signed projects.
Participate when required as technical duet in contracts negotiations of the scouted topics and ensure contracts are signed on due time.
Ensure ANP documentation is established with good quality (and as per ANP regulations) and submitted to ANP on time.
Issue timely R&D reports.
Support on the coordination of renewable energies projects with Accredited Institutions and Brazilian Companies.
Review the R&D project proposals (ANP forms PTR-A and PTR-B).
Engage technically with the contractors.
Support to validate, when necessary, the hardware (equipment) for infrastructure projects.
Manage the deliverables and provide assurances to the project based on ANP legislations.
Understand the complexity of the Brazilian grid system, to identify the possibility of integrating the resources of our contemplated projects with the local generation and distribution power systems.
Support on the optimization of project values considering techno-economic parameters.
ANP requires Oil Company’s based in Brazil their full compliance with the 1% levy obligation through local and eligible R&D investments
TEEPBR obligation will be higher within the coming years, what will require more R&D investments in Brazil guarantee the Brazilian affiliate compliance with the 1% ANP Regulation, and avoiding as such important fines and the possible loss of TEEPBR’s license to operate